Project Case Study

Opportunity Building

Tell Us About Your Project

Project Snapshot

Location
Redmond, WA
Year
2023
Square Footage
25000 SF
Duration
9 Months
Opportunity Building

The Brief

Project Overview

Linear Construction completed a 25,000-square-foot office renovation in Redmond, reconfiguring the space to better support daily operations while bringing the building up to current accessibility standards.

Over the course of nine months, the project included office reconfigurations, a new suspended ceiling grid system with updated ceiling tiles, electrical improvements, construction of two new restrooms, new carpet and paint throughout, and a redesigned entryway. The team also removed walls and connected two separate units to create a more unified and functional workspace for the building’s occupants.

Work Delivered

Scope of Work

The work behind the finished space.

  • Demolished walls to combine two units and reconfigured the entryway.
  • Installed a new ceiling grid, tiles, new carpet, and fresh paint.
  • Upgraded the entire electrical system to support the reconfigured layout.
  • Built two new bathrooms and made the entire office ADA compliant.

Case Study

Opportunity Building Remodel

Project Challenges

Project Challenge

The building required updated finishes, improved accessibility, and a more efficient layout while combining two separate units into one connected space.

LCS Solution

LCS Solution

Linear reconfigured offices, installed a new ceiling grid system, completed electrical upgrades, built two new restrooms, and redesigned the entryway while opening walls between both units.

Final Result

Final Result

The completed renovation created a single, connected workspace with improved accessibility and a layout better suited to the needs of building occupants.

Start a Conversation

Ready to start your own project?

Tell us what you want to build, renovate, or improve, and our team will help map the next step.